Maloya Inc. • 65A Mall Drive • Commack, NY 11725
(800) 294-1165
©2011 Maloya Inc. All rights reserved.
Designed by Progressive Marketing Group, Inc.
site map

Manufacturing Inspection

Ensuring quality and reliability are vital to the success of every project, initiative or assignment at Maloya. Our quality manual and procedures are ISO compliant and have been audited by a number of our customers. Full document inspection reports are available upon request.

Our inspection equipment is NIST (National Institute of Standards and Technology) traceable. Full Statistical Process Control (SPC) documentation is available for critical and long run components production, including a bar-coded MIS system. Quality and reliability are more than just words at Maloya: They are a way of life.

We have a CAR/CAN (corrective action request/corrective action notification) system in place, driven by the front line fabricators. We utilize MS Access database for our CAR/CAN, which provides quantifiable metrics for quality and process improvement. We also provide quarterly management audits.

Inspection Equipment:
2- Inspection Tables:
A) One table 36.00" x 60.00"
B) One table 36.00" x 24.00"

1- Etalon 15" Height Gauge
1- Browne & Sharpe 20" Height Gauge
1- 40" Vernier
1- 24" Vernier
1- 12" Vernier
10 - 8" Verniers
1 - 125 pc Steel Plug Gauge Sets (.501" to .625")
1 - 250 pc Steel Plug Gauge Sets (.251" to .500")
1 - 240 pc Steel Plug Gauge Sets (.011" to .250)
1 - 12 pc Miocrometer Set (0" to 12)
Assorted Block Gauges

Next Step:   Contact Maloya Today

Contact Maloya today to discuss your specific requirements. We will give you a fast and accurate quote on your project.

Whether you require metal fabrication, laser cutting, CNC bending or other metal work, our team has the skills to help you get the job done.

Call us today at 800-783-8214 or complete the form below.

Company:
Contact:
Phone:
Email:

How Can We Help You?
Metal Fabrication
Assemblies / Sub-Assemblies
Turnkey Manufacturing
Contract Manufacturing

Current Outsourced Metal Fabrication Spend:
$0 - $25,000
$25,000 - $50,000
$50,000 - $100,000
$100,000 - $250,000
$250,000 - $500,000
+$500,000

Questions / Comments:

Help Us Avoid Spam
            Please answer this question:   9+9=